VOLTA Schedule

Synchronise production with your actual capabilities.

Turn theoretical plans into achievable production orders that take into account machines, workshop schedules, resources, and supply priorities — for a planning that delivers on its promises.

Transform theoretical plans into achievable work orders that take into account machines, workshop schedules, resources, and supply priorities.

For a planning that delivers on its promises.

2f free

full

2f free

2d off

2d off

2f free

Line 8 capacity

Week 2 - 5

2f free

full

2f free

2d off

2d off

2f free

Line 8 capacity

Week 2 - 5

2f free

full

2f free

2d off

2d off

2f free

Line 8 capacity

Week 2 - 5

The final scheduling of your workshops.

Plan better, decide faster and always stay
one step ahead of the market.

Capture d'écran de la vue GANTT capacitaire dans le PO Workbench
Capture d'écran de la vue GANTT capacitaire dans le PO Workbench
Capture d'écran de la vue GANTT capacitaire dans le PO Workbench

A schedule aligned with the reality of the workshop

The "ideal" plans face bottlenecks, machine unavailability, and series changes.

With VOLTA Schedule: plan actual load by station, centre or line, incorporating capacities, campaigns, stoppages and settings. Choose your daily or weekly granularity and obtain a feasible schedule.

Capture d'écran montrant les détails d'une opération de gamme
Capture d'écran montrant les détails d'une opération de gamme

Advance availability, avoided blockages

We launch, only to discover too late that a component is missing or that a reception is slipping.

With VOLTA Schedule: each OF is synchronised with the stock status and supplier orders. The module identifies at-risk orders, offers solutions (rescheduling, substitution, resequencing) and prevents stockouts.

Line 8 · ASSEMBLY

RGS51001

Hydraulic coupler

39

piece

10

Final assembly

8h

08:47:59

Finish

M0008273

M0008274

RGS51001

Hydraulic coupler

2

piece

M0008275

AX312

AX RDMX-V4 HYD 2.5% LS ST+VX9

2

piece

Line 8 · ASSEMBLY

RGS51001

Hydraulic coupler

39

piece

10

Final assembly

8h

08:47:59

Finish

M0008273

M0008274

RGS51001

Hydraulic coupler

2

piece

M0008275

AX312

AX RDMX-V4 HYD 2.5% LS ST+VX9

2

piece

Line 8 · ASSEMBLY

RGS51001

Hydraulic coupler

39

piece

10

Final assembly

8h

08:47:59

Finish

M0008273

M0008274

RGS51001

Hydraulic coupler

2

piece

M0008275

AX312

AX RDMX-V4 HYD 2.5% LS ST+VX9

2

piece

Emergencies absorbed without chaos

An unforeseen event, a priority client, a breakdown… and the whole schedule has to be redone.

With VOLTA Schedule: adjust with drag-and-drop or by recalculating according to your rules. Move a series forward, insert an emergency, reschedule a task—all without disrupting the entire setup.

#RGS51001 — Hydraulic decoupler

Overview

Comments

Activities

Samuel has sent

39

pieces of

RGS51001

of the order

BvTag

20 minutes ago

Sarah has confirmed

39

pieces of

RGS51001

of the order

BvTag

2 hours ago

Sarah has launched

39

pieces of

RGS51001

in the order

BvTag

2 hours ago

Jean-François has put 14 projected orders in draft

Three days ago

#RGS51001 — Hydraulic decoupler

Overview

Comments

Activities

Samuel has sent

39

pieces of

RGS51001

of the order

BvTag

20 minutes ago

Sarah has confirmed

39

pieces of

RGS51001

of the order

BvTag

2 hours ago

Sarah has launched

39

pieces of

RGS51001

in the order

BvTag

2 hours ago

Jean-François has put 14 projected orders in draft

Three days ago

#RGS51001 — Hydraulic decoupler

Overview

Comments

Activities

Samuel has sent

39

pieces of

RGS51001

of the order

BvTag

20 minutes ago

Sarah has confirmed

39

pieces of

RGS51001

of the order

BvTag

2 hours ago

Sarah has launched

39

pieces of

RGS51001

in the order

BvTag

2 hours ago

Jean-François has put 14 projected orders in draft

Three days ago

A smooth coordination between trades

Production, approval, quality, and logistics do not see the same film.

With VOLTA Schedule: the schedule becomes a shared reference. Delays are flagged, priorities updated, decisions tracked. Everyone knows what to do and when.

PO Workbench

276

Prepare order

🚨 Operations delayed

📦 Packaging

Search for orders

Filters

Sorted by

Priority

Status

Started

Group

Order Num

Workshop

PO Workbench

276

Prepare order

🚨 Operations delayed

📦 Packaging

Search for orders

Filters

Sorted by

Priority

Status

Started

Group

Order Num

Workshop

PO Workbench

276

🚨 Operations delayed

Search for orders

Filters

Status

Started

Workshop

Workshop meetings that cut to the quick

We spend too much time explaining the gaps and not enough time closing them.

With VOLTA Schedule: a clear dashboard highlights discrepancies, impacts, and actions. Rituals are shorter, more decisive, and execution-oriented.

What you get with VOLTA Schedule

Realistic scheduling

Capabilities, schedules, constraints and series changes taken into account.

Realistic scheduling

Capabilities, schedules, constraints and series changes taken into account.

Realistic scheduling

Capabilities, schedules, constraints and series changes taken into account.

Supply synchronization

Direct links with inventory, supplier POs and S&OP priorities to anticipate blockages.

Supply synchronization

Direct links with inventory, supplier POs and S&OP priorities to anticipate blockages.

Supply synchronization

Direct links with inventory, supplier POs and S&OP priorities to anticipate blockages.

Quick adjustments

Re-sequencing by drag-and-drop, recalculation according to rules, insertion of urgent cases without chaos.

Quick adjustments

Re-sequencing by drag-and-drop, recalculation according to rules, insertion of urgent cases without chaos.

Quick adjustments

Re-sequencing by drag-and-drop, recalculation according to rules, insertion of urgent cases without chaos.

Shared visibility

Real-time status of work orders, delays, constraints, ETA and downstream impacts.

Shared visibility

Real-time status of work orders, delays, constraints, ETA and downstream impacts.

Shared visibility

Real-time status of work orders, delays, constraints, ETA and downstream impacts.

Traceability

History of arbitration and change log for controlled management.

Traceability

History of arbitration and change log for controlled management.

Traceability

History of arbitration and change log for controlled management.

Tell us about your workshop constraints and let's build a realistic timetable together.